Project Details:
STCI was the contractor selected by Nutrien to overhaul the material handling processes around Lanigan’s Rod mill. To eliminate manual labour and increase the safety of their workers we completed a feasibility study that included preliminary engineering. This study was then further developed to detailed engineering, and finally, STCI executed the installation of an engineered lifting beam, storage stand, dispensing table and collection bin.