Project Details:
STCI was the contractor selected by Nutrien to upgrade the Natural Gas supply system to Nutrien’s 15 million BTU make-up air unit. This unit was replaced to meet the demands of their additional dryer and to provided better maintenance access. To minimize mill downtime STCI tied-in the gas line during a planned shut-down and completed the remaining work while the mill was operational.