Project Details:
STCI was the contractor selected by SaskPower to complete the overhaul and upgrade to the electrical and controls systems at the Meadow Lake Power Station. Originally commissioned in 1984 the power station was in need of many improvements and upgrades to extend the life of the facility through the year 2030. STCI completed the demolition and replacement of the entire controls systems, while upgrading the power and communications systems throughout the facility.